loading

Professional manufacturer of Detergent Powder Production Line and Liquid Detergent Production Line.

BLOG
Home  > INFO CENTER  > BLOG  > 

The upgrading and reconstruction of detergent powder project with an annual output of 100,000 tons started construction

The upgrading and reconstruction of detergent powder project with an annual output of 100,000 tons started construction

2020-10-16

The upgrading and reconstruction of detergent powder project with an annual output of 100,000 tons started construction

The upgrading and reconstruction of detergent powder project of Liaoning Lonkey Industrial Co., Ltd. with an annual output of 100,000 tons started construction. This upgrading project has high technological requirements and needs to meet the technical requirements of P&D and Lonkey. Moreover, the construction period is tight, and it is planned to be put into operation in February, 2021. Our company won the bid for the deepening design and construction of this project, and has actively implemented the design and construction work.


Chat Online 编辑模式下无法使用
Leave Your Message inputting...