loading

Professional manufacturer of Detergent Powder Production Line and Liquid Detergent Production Line.

BLOG
Home  > INFO CENTER  > BLOG  > 

Spray tower detergent powder plant with annual output of 100,000 tons was put into operation

Spray tower detergent powder plant with annual output of 100,000 tons was put into operation

2022-03-14


                 
                 
                 
                 
                 
                 

年产10万吨高塔洗衣粉生产线交付运行

由公司设计承建的国外年产10万吨高塔洗衣粉生产线于近日完成调试,交付运行。


Spray tower detergent powder plant with annual output of 100,000 tons was put into operation

The overseas spray tower detergent powder production line with an annual output of 100,000 tons which was designed and contracted by Meibao, was completed debugging and put into operation recently.     

Chat Online 编辑模式下无法使用
Leave Your Message inputting...